Apollo 1 Astronauts Ed White

The Apollo command and service module was much bigger and far more complex than any previously implemented spacecraft design. In October 1963, Joseph F. Shea was named Apollo Spacecraft Program Office (ASPO) manager, responsible for managing the design and construction of both the CSM and the LM.
In a spacecraft review meeting held with Shea on August 19, 1966 (a week before delivery), the crew expressed concern about the amount of flammable material (mainly nylon netting and Velcro) in the cabin, which both astronauts and technicians found convenient for holding tools and equipment in place. Although Shea gave the spacecraft a passing grade, after the meeting they gave him a crew portrait they had posed with heads bowed and hands clasped in prayer, with the inscription:

a b c d e f g h i j k l m n o p q r s t u v w x y z